Home Nova Campus
Nova campus
Building a Global Zero-Carbon Computing Infrastructure Industry Campus
Powered Campus
Powered Campus
Converging strategically-located sites, land resources, utility supply, and infrastructure conditions to form best-in-class hyperscale base for AI-enabled demand.
Renewable Energy
Renewable Energy
Investing in utility-scale renewable energy bases with localized energy consumption, achieving cascade utilization of energy from wind / solar to industrial uses and to cities.
Advanced Equipment
Advanced Equipment
Best-in-class, customized data center equipment and hardware solutions based on deep industry expertise, white-box supply chain, and leading R&D capabilities.
Network
Water Treatment/Supply Station
IT Capacity
Power
Land
Hyperscale
"Renewable Energy + Data Center"
Integrated Infrastructure
Hyperscale
"Renewable Energy + Data Center"
Integrated Infrastructure
Power
NOVA provides customers with green, safe, and economical clean energy based on the energy structure of the investment country, including but not limited to investment, construction, cooperation, etc.
  • Energy Investment
    Energy Investment
  • Multi-Channel Grid Layout
    Multi-Channel Grid Layout
  • Substation Assets
    Substation Assets
  • Distributed Photovoltaic
    Distributed Photovoltaic
Land
NOVA team has rich experience in global data center site selection. In the wave of new generation artificial intelligence computing power, NOVA takes "energy flow, data flow and business flow" as the core data center site selection concept to create the most valuable data center land asset reserve.
  • Unique Location
    Unique Location
  • Land Reserve
    Land Reserve
  • Expansion Rollback
    Expansion Rollback
  • Territorial Feedback
    Territorial Feedback
DATA CENTRE
The NOVA core team has 20 years of experience in developing hyperscale data centers in emerging markets such as South East Asia, East Asia, and South Asia. With a significant multi-line parallel mode of planning, design, construction, and operation, they accelerate the parallel delivery of modules such as land, power, and equipment, and complete the development and deployment of hyperscale data centers within 6-9 months.
  • Containerized Deployment
    Containerized Deployment
  • Multi-line Parallel Landing
    Multi-line Parallel Landing
  • Standard Green Interface
    Standard Green Interface
  • Global Linkage of Supply Chain
    Global Linkage of Supply Chain
Nova campus
ACTIVELY PRACTICING ZERO-CARBON MODEL IN THE DIGITAL AGE
CONTACT US